North East Footing ABN Mast 6 Nov 1956
|
Filling in North West Footing 6 Nov 1956
|
Sections Ready for Assembly (ATN7 Mast Behind)
|
Moving the NW Leg of ABN Mast to base
|
Positioning the NW Leg onto the base
|
|
Nudging leg into position
|
Workers Aligning Bolt Holes
|
Bolting NW Leg to the base
|
Inspecting Final Assembly
|
ABC Cameraman films bolting first mast leg
|
|
Another Section lifted
|
Workers Aligning Bolt Holes
|
NE Leg assembly
|
Start of Level 2 Assembly
|
Mast Assembly as at 16 March 1957
|
|
Pye OB Van alongside Transmitter
|
Yet Another Section Added
|
View across Lane Cove
|
Construction as at 16 May 1957
|
|
|
|